Cable
Reel Specification Data Sheet
|
|
|
|
|
To
make sure you get the right reel, please review your requirements
using the Data Sheet below. If you need help,
contact our sales team. |
|
|
|
|
Request
Date ____/____ /_____ |
|
Sales
Person ______________________________ |
|
|
|
|
Company |
________________________________ |
Name
___________________________________ |
|
________________________________ |
Title
____________________________________ |
|
________________________________ |
Phone
___________________________________ |
|
________________________________ |
Fax
_____________________________________ |
Company
Type _______________________________ |
E-mail
___________________________________ |
|
|
|
|
2.
Other application information: Describe the application or attach
a sketch. For example: Will the reel need to lift
a cable-end accessory, or will the cable
be run through rollers or sheaves? Or will the cable pay out
at an angle? |
|
|
|
|
___________________________________________________________________________________ |
___________________________________________________________________________________ |
|
|
|
|
ENVIRONMENTAL
DATA Describe the environment in the area
where the cable reel will be installed and used. |
|
|
|
|
1.
Indoors Outdoors
Dusty Snow Ice |
|
|
|
|
|
|
Electrical
enclosure sealing required (if known) |
NEMA _______ or IP ________ |
|
|
|
|
2. Ambient temperature Min _____ Max
_____ Degrees F Degrees
C |
|
|
|
|
3.
Will there be corrosive materials present?
Yes No |
|
|
|
|
|
If
yes, describe the type of corrosive _______________________________________________ |
|
|
|
|
4.
Is this a hazardous location? Yes
No
If yes, state required NEC Class ______ Division
______ Group ______ |
|
|
|
|
5.
Other considerations (vibration, shock loads, etc): ___________________________________________ |
|
|
MECHANICAL
DATA |
|
|
1.
DUTY CYCLE ______cycles per _______ [
How often will the reel payout and retract? ] |
|
|
|
Note:
If the reel will cycle 20,000 times or more per year and/or
if the environment is unusually harsh, premium
cable may be required. Please consult us. |
|
|
2.
SPEED If reel will power moving equipment, what is the
speed of the equipment? _____ Ft. per minute
M/min. |
|
|
3.
PAYOUT ANGLE How will the cable be paid out?
Parallel with spool At an angle from the
spool |
|
|
Note:
If the cable payout is more than 15 degrees from parallel with
the spool, a swivel bases or swing-mount will be
required, refer to Options below or contact us for recommendations. |
|
|
4.
OTHER MECHANICAL NOTES Will cable pass through/along
devices such as rollers or sheaves that might
affect cable retraction? |
|
|
|
|
|
ELECTRICAL
DATA |
|
|
|
|
|
1.
AMPACITY REQUIRED ________________ [The
amount of amperage the reel/cable needs to handle per conductor.] |
|
|
|
|
|
|
Motor horsepower-to-amperage conversion
To power an electromagnet - please consult us. |
|
|
|
|
|
2.
NUMBER OF CONDUCTORS REQUIRED (with ground) ___________
[ Note: Single phase
needs three conductors.; three-phase needs four ] |
|
|
|
|
|
3.
WIRE GAUGE/SIZE REQUIRED ___________
AWG Metric [To handle the
required amperage per conductor.] |
|
|
|
|
|
4.
CABLE TYPE NEEDED ______________________________ |
|
|
|
|
|
5.
OPERATING VOLTAGE ______________ (volts)
AC DC |
|
|
|
|
|
6.
OPERATING FREQUENCY____________ Hz (Note: USA is 60 Hz) |
|
|
|
|
|
CABLE
LENGTH NEEDED Add up the cable length
you need on the spool. |
|
|
|
|
|
Active
length |
_________ [The difference between minimum and
maximum operating payout. See Drag drawing above] |
Inactive
length |
_________ [The cable that will stay outside the
reel, even at minimum payout. See Lift drawing
above] |
Sag
allowance |
_________ [For Stretch applications
only, add 10% to the active + inactive length for cable sag.
See Stretch drawing above] |
Lift
height |
_________ [The distance from where the unwound
cable will lay up to the reel location - see Retrieve
drawing above] |
|
|
Hookup
length |
__________
[The amount needed to make connections at the free end
of the cable - see Retrieve drawing above] |
|
|
_________
------------ |
|
TOTAL
CABLE LENGTH NEEDED ON THE SPOOL
(the sum of all lengths listed above) |
|
|
|
|
|
|
|
|
|
Feeder
Cord Length (if needed) _____________
[To bring power to the reel - See Lift
drawing above. A feeder is standard on some reels.] |